The Manioca industrial estate in Eschen and KIKA in Liezen
Piles for the Manioca industrial estate in Eschen (Liechtenstein) and KIKA in Liezen
The new Manioca industrial estate in Eschen (Liechtenstein) was built on an old lake bed. Firm ground is only found in the underlying moraine at a depth of over 20 metres. The solution for the right foundations was therefore compressed piles from a single casting.
The KIKA company has built a new furniture store in Liezen. During the first geological investigations, the planners found themselves confronted with peaty ground and non-supporting gravel strata as far as the underlying moraine. A solution was found by constructing the foundations on ductile piles from TRM at a depth of 40 -50 metres.
Detailed information
The Manioca industrial estate in Eschen (Liechtenstein)
Client: Manioca AG Customer: Meistebeu AG 140 jacket-compressed piles DN 170 Total: 4,000 m Loads: 900 kN Supporting device: O+K RH9 with Krupp 1500 ram hammer Period: April 2002 – 3 weeks
KIKA in Liezen Client: KIKA Customer: Rappatz & Jahn 360 uncompressed piles DN 170 and 118 mm Total: 12,000 m, pile lenghts between 38 and 48 m Loads: 170 mm 800 kN/pile and 118 mm 500 kN/pile Supporting device: LH 942 with Krupp 1300 ram hammer Period: August 1991 | | |
|  Installation of the ductile piles at the Manioca industrial estate in Eschen
 Installation of the ductile piles at KIKA in Liezen
|